Customer journey

How an engagement actually runs.

This is the path of working with Tatiana Mazepa, from the first conversation to the last edit of a document. It is the same sequence the practice asks clients to make explicit inside their own companies: a named stage, what you bring, and what you leave with.

An empty round ash table with blank gray cards and one carmine thread between two of them.
A working arrangement, not a performance. Illustrative image.

You do not pass through every stage by default. Many clients stop after the diagnostic. Redesign, playbooks, and adoption are later choices, each with its own scope. The commercial terms for those choices are on the offer page. The services themselves are described in full under services.

  1. Stage 01

    Introductory conversation

    The first conversation is about thirty minutes. Its job is to decide whether there is a real workflow to look at, and whether Tatiana Mazepa is the right practice for it. It is not a sales presentation and it does not produce a map. The introductory conversation is free and does not create an obligation to continue.

    You bring
    A plain description of the workflow that hurts, who feels the pain, and what you have already tried.
    You leave with
    A yes, a no, or a clearer question. If the request is actually for software, legal advice, or temporary staff, you will hear that directly.
  2. Stage 02

    Written scope

    If the conversation shows a fit, the practice sends a proposal. It names the workflow, the people to be involved, the deliverables, the timing, the fee, and what is excluded. Paid work does not start until you accept that proposal in writing. The website is not the contract. The proposal is.

    You bring
    A decision-maker who can accept or refuse the proposal, and any constraint that must be written in — a deadline, a system the practice must not enter, a topic that is off limits.
    You leave with
    A document you can accept, amend, or decline. Silence is not acceptance.
  3. Stage 03

    Fieldwork

    Fieldwork is how the current state is established. The practice talks with people who do the work, not only with the person who sponsors it, and reads the artifacts they actually use. Questions cover a normal week and a bad week. The aim is the path that exists, including the shortcuts, not the path in the quality manual.

    You bring
    Access to the named people, and the checklists, tickets, templates, or trackers they open. System administration access is not required. See the FAQ on access.
    You leave with
    Nothing final yet. You will see notes taking shape, and you can correct a factual error as soon as you notice it.
  4. Stage 04

    Working review

    The map is read back to the sponsor and, where it is useful, to the people who were interviewed. This session is where “that is not how it really works” is supposed to surface. Corrections are made in the room. A map that cannot survive this conversation is not delivered as finished.

    You bring
    The people who can recognize a wrong stage when they see one. A readout with only spectators wastes the session.
    You leave with
    A corrected current-state map and a friction register, or a future-state draft if redesign was in the scope.
  5. Stage 05

    Decision to stop or continue

    After a diagnostic, you decide. You can stop. The map and the register are yours to use. Or you can commission a redesign, a handoff design, playbooks, cadence, or adoption support. Each of those is a new written scope, even when it follows immediately. There is no automatic continuation and no penalty for stopping.

    You bring
    A view on what you are willing to change. A redesign cannot retire a step that leadership has declared untouchable.
    You leave with
    Either a closed diagnostic, or a proposal for the next engagement.
  6. Stage 06

    Build the artifacts

    If you continue, the practice builds only what the new scope names: a future-state workflow, handoff packets, decision rules, playbook pages, or a cadence sheet. Drafts are reviewed with the people who will use them. The test is whether a person can follow the page without calling the author.

    You bring
    Time from the future users for a read-through. Their hesitation is the most useful feedback.
    You leave with
    The documents named in the proposal, and a note of what was deliberately left out.
  7. Stage 07

    Adoption check

    When adoption support is included, there are two check-ins in the first month, unless the proposal says otherwise. The practice asks what people did with real cases, what they skipped, and where the writing was wrong. The documents are amended. New wishes that were not in scope are listed and not quietly absorbed.

    You bring
    A sample of cases from the weeks since the change, and honesty about what was bypassed.
    You leave with
    Revised pages, check-in notes, and a list of issues that remain out of scope.

What “working together” requires

The practice can draft a map from interviews. It cannot discover a process that nobody is willing to describe, and it cannot install a new path in a team that has not seen it. The sponsor’s job is access, decisions, and protection of the time of the people being interviewed. Tatiana Mazepa’s job is the questioning, the structure, and the writing.

Timing in a proposal is a plan for one named workflow, not a promise that every organization moves at the same speed. A typical diagnostic runs two to three weeks. A redesign of one process often runs three to six. Those ranges are typical, and the proposal is what governs. If a key person is unavailable, the date moves. That is stated rather than absorbed in silence.

To begin, write to the practice with the workflow you have in mind. Questions about disruption, access, and confidentiality are answered in the FAQ.